COMPLETED DELIVERY EXPERIENCE
Ünteks — Industrial Rooftop Solar
8.1 MWp completed solar delivery experience from MizanPower's engineering and delivery network.
COMMERCIAL VIEW
What this project shows.
Why it matters
At this scale, the roof is no longer just unused space. It becomes part of the site's energy infrastructure.
For a manufacturer with strong daytime demand, solar can replace part of the electricity that would otherwise be bought from the grid. That does not remove grid dependence, but it can reduce exposure to purchased-power prices.
Where storage fits
A battery is a second decision. We would only add it where half-hourly demand, export limits, tariffs or flexibility value justify the extra asset.
MIZANPOWER VIEW
Roof → on-site generation → self-consumption → lower grid exposure → test storage only where the load profile supports it.
Project-specific generation, savings, carbon impact, export and storage value depend on site location, half-hourly demand, tariff, grid constraints and final engineering. We do not present illustrative economics as realised project results.